Raya Project Home

Click images for full-size photos tracking the progress of this restoration project.

Archive:
Pre-Construction     Week 1     Week 2     Weeks 3-4     Weeks 5-9    Weeks 10-13

Weeks 5-9
November 2008

Abutment     Abutment2
     
The first tier of the abutments is poured with concrete and the forms are stripped,
revealing the concrete towers that will eventually support a bridge over the creek.

          
Re-forming     Erosion Prep1
Soil is back-filled and the second tier of the abutments begins to be formed. 
The bridge will mount into the L-shaped structure of the second tiers.

   
Channel     
     
Erosion Prep2     Channel2
  
Erosion control materials and a dewatering line are set up to keep the site dry while
the creek channel between the abutments is restored with native rock. The new grade will not block steelhead migration.

    
      Creek Flow

  During the first major rains of the season, the creek returnsnormal flow through the restored channel. 
The work sites are protected from erosion with straw rolls

 

     Raya Project Home

Archive:
Pre-Construction     Week 1     Week 2     Weeks 3-4     Weeks 5-9    Weeks 10-13

   


Home  Carp Creek  The Coalition

Projects  Documents  Links 

 ©Carpinteria Creek Watershed Coalition

Last updated Dec 4, 2008

 

Email

©Carpinteria Creek Watershed Coalition