Week 1
October 2008
       Dewatering    Coffer Dam
A portable generator and pumps are used to de-water the creek channel in the construction zone.
A "coffer dam" is constructed from sand bags and plastic sheeting as part of the de-watering system.
          

Footbridge
 The old pedestrian footbridge is brought down first.  The new bridge
will allow pedestrian crossing.

 

Excavator    Smashing

 

Smashing2    Smashed

The excavator arrives at the site and processes to

smash apart the concrete crossing.

      


 