Week 1:
 September-October 2008

       Crossing

Before construction, the concrete stream crossing ("Arizona crossing") presents a barrier to fish migration.

  


  

Geotech

A geotechnical investigation was performed to determine soil properties. 

 


Smashing    Excavation
An excavator lifts a large and drops a large boulder to break apart the concrete slab.
Concrete fragments and extra soil are removed from the stream crossing.

Hauling    Sorting
Soil materials are hauled out of the crossing and mechanically sorted. 
Sorted soil, cobbles, and rocks will be used to restore the creek channel to a natural gradient.  

  


  
Archive:
Week 1     Week 2-3     Weeks 4-6     Weeks 7-10     Weeks 11-12


Home  Carp Creek  The Coalition

Projects  Documents  Links 

 ©Carpinteria Creek Watershed Coalition

Last updated Oct 1, 2008

 

Email

©Carpinteria Creek Watershed Coalition