Weeks 7-9
October 2008
 

Piles

Road fill     road fill 2

The wood frame is stripped from the first bridge abutmet and soil is backfilled to
prepare the road base.


   Tanks     Abutment
Wood and metal framing continues at the second bridge abutment. 
   

     
6Channel
   
7Channel     8Channel  

Restoration of the creek channel begins.  First, the channel is graded to a stable slope.

  

 Lining

 

9Rock     Lining

Filter fabric is installed along the abutment slopes and large rock is placed
on top to protect the bridge foundation.


  

Forming     Forming

Rock and soil are formed around the bridge foundations in the creek channel.

 


 

 

Archive:
Week 1      Week 2      Weeks 3&4     Weeks 5&6     Weeks 7-9     Weeks 10-12 

 

Bliss Project Home

 

 


Home  Carp Creek  The Coalition

Projects  Documents  Links 

 ©Carpinteria Creek Watershed Coalition

Last updated Nov 3, 2008

 

Email

©Carpinteria Creek Watershed Coalition