Weeks 5 & 6
October 2008
 

Piles    Tanks

The final bridge supports are drilled and poured with concrete and the rebar cages are installed.
The drilling operation de-mobilizes and removes water  tanks and equipment from the site.


Framing1    Framing2
Wood and metal framing begins at the second bridge abutment. 
   

     
Abutment     Abutment2
  
Abutment3  
Framing for the bridge abutments continues.  The wood elements creates a mold for the concrete.

 


  

 Steel     Frame

The steel and woodwork follow a complex design to ensure a safe, stable foundation
for the bridge that will tolerate creek flow and floods.

   


 

 

Archive:
Week 1      Week 2      Weeks 3&4     Weeks 5&6     Weeks 7-9     Weeks 10-12 

 

Bliss Project Home

 

 


Home  Carp Creek  The Coalition

Projects  Documents  Links 

 ©Carpinteria Creek Watershed Coalition

Last updated Oct 14, 2008

 

Email

©Carpinteria Creek Watershed Coalition